Category | Polymer , Thermoset , Epoxy , Epoxy, Electrically Conductive |
Manufacturer | Parker Chomerics |
Trade Name | CHO-BOND |
Port | Shanghai port,China |
Trade Terms | FOB, CFR, CIF |
Payment Terms | L/C, T/T, Western Union |
Download PDF | Parker Chomerics CHO-BOND 360-20 Conductive Epoxy.pdf |
Price | EMAIL US sales@lookpolymers.com |
Physical Properties | Metric | English | Comments |
---|---|---|---|
Specific Gravity | 4.70 - 5.30 g/cc | 4.70 - 5.30 g/cc | |
Volatile Organic Compounds (VOC) Content | 0.00 g/l | 0.00 g/l | |
Thickness | >= 254 microns | >= 10.0 mil |
Mechanical Properties | Metric | English | Comments |
---|---|---|---|
Shear Strength | 11.0 MPa @Temperature 65.6 °C, Time 7200 sec |
1600 psi @Temperature 150 °F, Time 2.00 hour |
Lap |
Thermal Properties | Metric | English | Comments |
---|---|---|---|
Maximum Service Temperature, Air | 100 °C | 212 °F | |
Minimum Service Temperature, Air | -62.0 °C | -79.6 °F |
Electrical Properties | Metric | English | Comments |
---|---|---|---|
Volume Resistivity | <= 0.0050 ohm-cm @Temperature 65.6 °C, Time 7200 sec |
<= 0.0050 ohm-cm @Temperature 150 °F, Time 2.00 hour |
Processing Properties | Metric | English | Comments |
---|---|---|---|
Cure Time | 15.0 min @Temperature 115 °C |
0.250 hour @Temperature 239 °F |
|
45.0 min @Temperature 100 °C |
0.750 hour @Temperature 212 °F |
||
60.0 min @Temperature 95.0 °C |
1.00 hour @Temperature 203 °F |
||
120 min @Temperature 66.0 °C |
2.00 hour @Temperature 151 °F |
||
1440 min @Temperature 24.0 °C |
24.0 hour @Temperature 75.2 °F |
||
Pot Life | 60 min | 60 min | |
Shelf Life | 9.00 Month | 9.00 Month |
Descriptive Properties | Value | Comments |
---|---|---|
Binder | Epoxy | |
Consistency | Medium Paste | |
Coverage | 7.1 cm2 / g | |
Filler | Ag/Cu | |
Mix Ratio | 1:1 | |
Working Life | 1 hr |